The aim of this project is the placement of the first Opra turbine on pyrolysis oil at the Warmtenet Hengelo (District Heating Network Hengelo) site in 2012. This unit will use about 25% of the Empyro BV pyrolysis oil production. Several newspaper articles (only in Dutch) have been published on this matter.